(133a) Modeling of an Industrial Delayed Coker Unit
AIChE Spring Meeting and Global Congress on Process Safety
2021
2021 AIChE Virtual Spring Meeting and 17th Global Congress on Process Safety
Computing and Systems Technology Division
Process Modeling and Simulation
Thursday, April 22, 2021 - 11:00am to 11:20am
Figure 1- Simplified diagram of the delayed coking process
In order to control the process in an optimum way, the unit behavior was examined by using the first-principle model. The model parameters were estimated using the plant operating data. The first step is to determine the contents of the reactor input and output by characterizing the coke drum outlet and furnace input streams. A simplified new methodology for the estimation of coke drum effluent was developed by examining the techniques suggested in the literature2,3. The developed model has been validated by comparing obtained results with actual process conditions. Calculations were carried out in a simulation platform where MATLAB, Microsoft Excel, Aspen HYSYS and Python programs are integrated. After the input stream of the coke drums was estimated, the reactor model was successfully developed.
Keywords: Modeling, Integrated programing tools, Optimized process parameters
References
[1] Sawarkar, A.N., Pandit, A.B., Samant, S.D., Joshi, J.B., 2007. Petroleum residue upgrading via delayed coking: a review. Can. J. Chem. Eng. 85 (2), 1â24.
[2] Borges, C. N., Mendes, M.A., Alves, R. M. B., 2015. Mathematical Modeling of an Industrial Delayed Coking Unit, 12th International Symposium on Process Systems Engineering and 25th European Symposium on Computer Aided Process Engineering. May â 4 June 2015, Copenhagen, Denmark © 2015 Elsevier B.
[3] Kaes, G.L. Refinery Process Modeling: A Practical Guide to Steady-State Modeling of Petroleum Processes, 1st Edition, 2000.