(185a) The 1969 Rocky Flats Fire - We Should Not Forget. the 1969 Rocky Flats Fire Was Arguably the Worse Nuclear Fire in United States History. | AIChE

(185a) The 1969 Rocky Flats Fire - We Should Not Forget. the 1969 Rocky Flats Fire Was Arguably the Worse Nuclear Fire in United States History.

The 1969 Rocky Flats fire occurred on Mother's Day. Most in the nuclear industry consider it the worse nuclear fire in history occurring in the United States at the former nuclear weapons production facility. But for the heroic efforts by the on-site fire department, there would have been a significant release of radioactive material in the Denver metro area. This presentation will provide a background and mission on the facility, the factors that lead to the fire, the efforts of the fire department, and the lessons learned from this fire.

The dollar loss from the fire is calculated to approach or exceed $1B in today's dollars. It took over 1-million person hours to clean-up the facility after the fire. Further the fire resulted in the loss of production of nuclear triggers for the US arsenal. The main contributor to the fire was the excessive combustible loading within the facility that consisted of neutron shielding and glovebox plexiglass windows. Further, the facility was not protected with an automatic sprinkler system.

As a result of this fire, the Department of Energy (at the time the United States Atomic Energy Commission), revamped it's overall fire protection program and under went a massive improvement program of installing automatic sprinklers throughout the complex. Other actions including reducing the amount of combustible neutron shielding, providing fire detection within gloveboxes, and the inclusion of fire detection and suppression for exhaust filter plenums. As a result of these actions, currently the DOE has an exceptional fire loss record, that is significantly less than normal industries.

The back side of DOE's success is that fact we can't ease-off on our fire protection program efforts and forget about our past. We must ensure a fire like this never happens again in the nuclear weapons production complex. Fire Protection Engineers have many useful tools to ensure we operate these facilities safely. These tools include taking a performance based approach to facilities and processes, fire modeling, fire testing, etc. The author is using these tools today in supporting the Department of Energy with their ongoing multi-billion projects across the agency.

Topics 

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

AIChE Pro Members $150.00
AIChE Emeritus Members $105.00
Employees of CCPS Member Companies $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $225.00
Non-Members $225.00