(81b) CGC Fouling Control for Six Year Run Length Achievement in C2-C3 Feed Gas Cracker | AIChE

(81b) CGC Fouling Control for Six Year Run Length Achievement in C2-C3 Feed Gas Cracker

Authors 

Boll, J. - Presenter, DORF KETAL
Mohd Nor, M. Z., PETRONAS Gas Berhad
Chong Chee An, K., Dorf Ketal


This is a case history of collaboration between PETRONAS Chemical Olefins and Dorf Ketal that improved Cracked Gas Compressor system fouling control in a C2-C3 gas cracker feed to achieve a six-year run length. The collaboration identified root causes of historical fouling problems in this system. Improved understanding of root causes resulted in changes in wash oil & wash water injection, antifoulant chemistry, injection systems and monitoring. A combination of these actions and disciplined execution led to this success.

The paper will review the history of the fouling control program, past and present to demonstrate the correlation between program design and run length results.

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

AIChE Pro Members $150.00
AIChE Emeritus Members $105.00
Employees of CCPS Member Companies $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $225.00
Non-Members $225.00