(247aa) Review of Flare Requirements and Challenges in Implementation
AIChE Annual Meeting
2016
2016 AIChE Annual Meeting
Computing and Systems Technology Division
Interactive Session: Systems and Process Control
Monday, November 14, 2016 - 3:45pm to 5:45pm
In addition, the compliance standards and limits pose their own challenges.In order to comply with the standards and limits, the process control for collaboration between instruments and analyzers becomes important to help the board operator understand and operate the flare. The process control system has to cope with a wide range of operating conditions which creates difficulty in tuning the controller to be effective. For example from zero flow while waste gas is going to a flare gas recovery system to large flows during emergency flaring or for a range of waste gas composition. Furthermore, there are timing issues to contend with, such as instrument lags, valve response times or gain, and travel time for added steam and supplemental gas to reach the flare tip (or the combustion zone). A degrees of freedom analysis and discussion of the control disturbances is presented for troubleshooting the compliance limits and standards.
Topics
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |