(65c) Best Practices in Pilot Plant Layout
AIChE Annual Meeting
2016
2016 AIChE Annual Meeting
Process Development Division
Best Practices in Pilot Plants
Monday, November 14, 2016 - 8:45am to 9:15am
The way a pilot plant is laid out during construction affects its safety, operability and maintainability. Even more critical the initial layout is usually very costly and time consuming to modify later when problems are identified, if such modifications are even possible. All too often this is an area addressed at the last moment as construction is ongoing or too casually during the design phase with attendant problems. Even seemingly simple areas like how a vessel is to be supported or what type orientation to specify for a pump’s head can have serious repercussions during layout.
This presentation will discuss the various approaches to laying out a pilot plant with their advantages and disadvantages. It will also give some guidelines as to what the author has found to be the “best practices” when positioning equipment. The presentation will also discuss common problem areas and suggest several approaches to be considered to address these issues.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |