(84a) Optimizing a Mechanical Integrity Program Using Risk Based Inspection – a Case Study
AIChE Spring Meeting and Global Congress on Process Safety
2011
2011 Spring Meeting & 7th Global Congress on Process Safety
Global Congress on Process Safety
Mechanical Integrity – Critical Line of Defense
Wednesday, March 16, 2011 - 8:00am to 8:30am
The Risk Based Inspection (RBI) process delivers a calculated risk value for each fixed equipment item in a facility. Fixed equipment risk values are the product of the Likelihood-of-Failure (LOF) and the Consequence-of-Failure (COF) factors. The calculated equipment risk values are used to optimize the facility inspection program in accordance with industry best practices (API-580/2009, API-581/2008).
Using the RBI calculated risk values, a fixed equipment relative risk ranking is established that strengthens the facility mechanical integrity program by allowing the operator to:
?set priorities and focus their attention on the critical areas ?justify capital investment for lifetime extension projects ?proactively address loss of primary containment and process safety issues
This paper will present the actual mechanical integrity gains realized from successfully implementing the RBI analysis at a gas plant facility. Examples of inspection findings due to the RBI plan recommendations are provided. Emphasis is placed on the accurate RBI prediction of hydrogen-induced damage for the product storage tanks, as the follow-up inspection confirmed.
Specific examples of the gas plant case study are offered as ?lessons learned?, illustrating potential RBI analysis pitfalls when required process steps are not followed.
Risk target selection is an important part of the RBI analysis. This paper based on the gas plant case study and in particular the storage tanks findings will offer a view regarding risk target selection. In conclusion, this paper will ? present RBI as a quantitative data analysis tool, compliant with industry best practices for fixed equipment risk management ? attest for the RBI's ability to strengthen a facility's mechanical integrity program ? identify potential pitfalls and RBI process breakdown ? review the risk target selection criteria and their significance
Keywords: Risk-based inspection, RBI, mechanical integrity, gas plant.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |