The Braskem Ethylene Southeast Plant expansion study from 500 MTA to 700 MTA recommended that the charge gas compressor turbine and the 1st and 2nd stages should be replaced. Due to a series of technical and logistical constraints, was decided to install a booster compressor upstream the first stage of the existing charge gas compressor. Minor modifications to the 4th & 5th stage impellers of the existing charge gas compressor were required to satisfy the final stage discharge pressure requirement
This paper describes all main steps since conceptual design in 2005 to it start up in 2009, including the development of the load sharing strategy and the definition of pressure profile to avoid major modifications in the existing intercoolers and caustic tower.
Topics
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
2012 Spring Meeting & 8th Global Congress on Process Safety
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |
The 24th Ethylene Producers’ Conference only
AIChE Pro Members | $100.00 |
Fuels and Petrochemicals Division Members | Free |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $150.00 |
Non-Members | $150.00 |