(66d) Cost Effectiveness of 2-Row Membrane System for FLNG
AIChE Spring Meeting and Global Congress on Process Safety
2012
2012 Spring Meeting & 8th Global Congress on Process Safety
12th Topical Conference on Gas Utilization
Floating LNG and Anti-Sloshing
Tuesday, April 3, 2012 - 10:45am to 11:15am
One of the most critical issues in engineering and design of FLNG is to reduce top side weight along with its load distribution to the sub-structure. Concentrated top side loads will result in an increase in hull structure costs. The developed 2-row containment system allows flexibility of top side load distribution. This system allows flexible modularization of top side equipment and reduces in hull structure cots as well. This system also provides great benefits in minimization of sloshing effects of the membrane storage FLNG. FLNG storage capacity can be increased with the 2-row system without sloshing problem. This paper presents the cost effectiveness of the 2-row containment system adopted to FLNG.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
2012 Spring Meeting & 8th Global Congress on Process Safety
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |
12th Topical Conference on Gas Utilization only
AIChE Pro Members | $100.00 |
Fuels and Petrochemicals Division Members | Free |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $150.00 |
Non-Members | $150.00 |