A splitter overhead condenser system in one of our Olefin plants has unique heat integration with the feed propane vaporization system and cooling water system.  Similar to other olefins plants, the reboiler has heat integration with the quench system.  The complex heat integration results in several challenging constraints that must be managed.  In addition, the active constraint set changes often depending on ambient and unit conditions.  These challenging constraints were not well handled in the existing Advanced Process Control (APC).  To address this problem, the APC was revamped using a creative design to robustly handle these constraints.  In addition, several advanced techniques and unique solutions were used throughout the design, modeling, and implementation of this revamp.  A unique aspect about this revamp is the APC uses a very long time-to-steady-state model (30 hours) while using a steady state model for the product composition, whereas, most APC models are significantly shorter (about 2 hours) with ramp models for the product composition

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

2013 Spring Meeting & 9th Global Congress on Process Safety
AIChE Pro Members $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $225.00
Non-Members $225.00
The 25th Ethylene Producers’ Conference only
AIChE Pro Members $100.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $150.00
Non-Members $150.00