(95a) Improve Furnace Availability and Control Downtime | AIChE

(95a) Improve Furnace Availability and Control Downtime

Authors 

Inamdar, S. - Presenter, Linde Engineering North America Inc.

In 2008, Ethylene Producer's Committee sponsored a worldwide furnace maintenance survey among ethylene producers.  Out of the 67 respondents, over 70% have furnace limited operation.  Thus, for majority of ethylene producers, an unscheduled outage either affects the plant capacity or requires adjustments to the decoking schedule of remaining furnaces.

This paper is a review of approaches to manage furnace availability by reducing likelihood and duration of an unscheduled downtime.  Design improvements can reduce the possibility of the most frequently reported furnace failures.  The downtime can be kept to a minimum through improved maintainability as well as through better preparedness.  Risk based inspection and monitoring focused on the most common failures can also avert an unscheduled furnace outage.

Topics 

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

2014 Spring Meeting & 10th Global Congress on Process Safety
AIChE Pro Members $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $225.00
Non-Members $225.00
The 26th Ethylene Producers’ Conference only
AIChE Pro Members $100.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $150.00
Non-Members $150.00