(46c) Rerate Overview; Aerodynamic, Mechanical, Efficiency Considerations, Trends
AIChE Spring Meeting and Global Congress on Process Safety
2015
2015 AIChE Spring Meeting and 11th Global Congress on Process Safety
The 27th Ethylene Producers’ Conference
Reliability and Operability of Rotating Equipment in Ethylene Plants
Monday, April 27, 2015 - 10:35am to 11:00am
This paper will take into consideration aerodynamic design, mechanical limitations, machine life assessment, and physical space limitations both inside the casing of the machine and on the compressor deck when a plant operator is considering new operating conditions for compressors and/or steam turbines. It will help the operator determine whether it is more beneficial to rerate an existing machine, or replace it with a new drop-in machine.
Additionally, the difference in the time it takes to install a rerate and the time it takes to install a new drop-in machine will be evaluated with an eye toward minimizing the duration of a plant turnaround. The role of machine auxiliaries such as oil systems, buffer gas systems, injection systems, and control systems will also be explained.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
2015 AIChE Spring Meeting and 11th Global Congress on Process Safety
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |
The 27th Ethylene Producers’ Conference only
AIChE Pro Members | $100.00 |
Fuels and Petrochemicals Division Members | Free |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $150.00 |
Non-Members | $150.00 |