Welcoming Remarks
AIChE Spring Meeting and Global Congress on Process Safety
2016
2016 AIChE Spring Meeting and 12th Global Congress on Process Safety
The 28th Ethylene Producers’ Conference
Ethylene Unit Safety Session
Wednesday, April 13, 2016 - 8:00am to 8:05am
In this study, this precondition has been relaxed for multi-capacity units, thus the unit usage can be more flexible. Thus, the real optimality can be found through CHS. To deal with the cycle connection issue from the relaxation of the precondition, a new module Cycle Connection Identification (CCI) is proposed. Obtained hoist schedule will be checked. Once a schedule with cycle connection problems is identified, a new cycle will be scheduled forcing the smooth connection with the first cycle. The objective of scheduling a new cycle is to match the beginning of the first cycle and the ending of the second cycle. If the two-cycle group is still with cycle connection issue, more cycles will be scheduled till the cycle group is free from cycle connection problems. Each cycle is called a sub-cycle and the constructed cycle group without cycle connection problems is called a full cycle. Note that in each sub-cycle, the work order and all transportation operations are completed.
In this paper, hoist scheduling models with/without such a precondition have been developed and proposed as mixed integer linear programming. The performance of the two models is tested through case studies and the difference is compared and demonstrated in detail.