(32d) Column Inspections and Safety
AIChE Spring Meeting and Global Congress on Process Safety
2019
2019 Spring Meeting and 15th Global Congress on Process Safety
Separations Division - See Also Kister Distillation Symposium
YP Tutorial: Separation Process Fundamentals
Monday, April 1, 2019 - 3:00pm to 3:30pm
Distillation column inspections are an essential step to a successful installation or revamp. Safety, mechanical design and knowledge of the process intended for the column are just a few of the topics that must be covered before entering the column. Setting up a checklist of items to be checked alone often requires significant attention to detail. This presentation will provide an introduction to preparation for a safe and successful column inspection.