(54al) Process Safety Management in Large-Scale Oilfields
AIChE Spring Meeting and Global Congress on Process Safety
2019
2019 Spring Meeting and 15th Global Congress on Process Safety
Global Congress on Process Safety
Electronic Poster Session - Grand Salon Kiosk
Monday, April 1, 2019 - 6:16pm to 6:22pm
Authors: Eng. Alejandra Miranda
Parra; Eng. Juan Carlos
Leonetti.
PROCESS SAFETY
MANAGEMENT IN LARGE-SCALE OILFIELDS
Cerro Dragon is the largest Argentinian oil field.
With more than 3,000 km² in extension, it holds most of Pan American Energy
(PAE) oil reserves and a third of its gas reserves. Here the company extracts
17% of the oil produced in the entire country.
Cerro Dragon has more than 140 facilities, between
Batteries and Injection Plants. These are distributed among 7 geographical
districts. Annually, 8 Revalidation HAZOPs take place, addition to 12 ABPS (safeguard
activation analysis) and an average of 192 MOCs studies (Management of change).
Applicable PSM
elements
HAZOP's Revalidations: Annual campaigns are carried out in order to keep
these process hazard analyses up to date. Argentina does not have mandatory
legislation requiring them to be revised; PAE however has adopted the
international good practices standards.
ABSP: The Activation of Process Safeguards analysis was
incorporated in order to ensure safeguards health in facilities, investigating
the shutdown triggering incidents occurring on a high frequency rate during
short periods of time.
MOCs: Tool,
through which changes are analyzed, recorded and approved.
Safety Review (SR) a MOC: In the process of analyzing the changes through MOCs
a process safety review is carried out.
PSM Tools
Due to the magnitude of the oilfield, the need to
manage the execution of these PSM elements was evidenced as well as the
monitoring of compliance of the resulting actions through web applications.
Selection Matrix for HAZOP analysis: A prioritization
matrix was developed for revalidation HAZOPs, by which the facilities are
selected according to their type (Injection Plants or Batteries), produced
flowrate, design capacity ratio and Integrity risk index.
Web applications for ABSP and MOCs management: These
applications purposes are the organization, concentration and documental
control of all the information related to activation of security barriers
analysis and to facilities modifications.
Action Tracking Site: This is a web platform on PAEs
Intranet, where the actions generated from the referenced PSM elements can be
tracked. The site allows an agile actions compliance monitoring through a
workflow that begins in the uploading of the action including details in
predetermined fields. The monitoring consists in the generation of alarms and
emails towards the resolved deadline. The resulting database allows the
development of monitoring and compliance indicators, as well as the
corresponding reports.
Results and Conclusion
In the last two years 16 HAZOPs analyses were carried
out, resulting in 365 actions, from which 269 were closed. During the same time
term 24 ABSPs took place.
In the last 4 year period 672 MOC´s were implemented
out of 768 examined changes.
6 SR were carried out in a ten months period during
2016.
The employment of Web Applications in large-scale
fields facilitated the usage and development of Process Safety Management
tools.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $150.00 |
Employees of CCPS Member Companies | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |