(37f) CGC Fouling Control for Six year Run Length Achievement in C2-C3 Feed Gas Cracker
AIChE Spring Meeting and Global Congress on Process Safety
2020
2020 Virtual Spring Meeting and 16th GCPS
The 32nd Ethylene Producers Conference
Ethylene Plant Rotating Equipment II
Wednesday, August 19, 2020 - 3:00pm to 3:20pm
This is a case history of collaboration between PETRONAS Chemical Olefins and Dorf Ketal that improved Cracked Gas Compressor system fouling control in a C2-C3 gas cracker feed to achieve a six-year run length. The collaboration identified root causes of historical fouling problems in this system. Improved understanding of root causes resulted in changes in wash oil & wash water injection, antifoulant chemistry, injection systems and monitoring. A combination of these actions and disciplined execution led to this success.
The paper will review the history of the fouling control program, past and present to demonstrate the correlation between program design and run length results.