Design Considerations for Deciding Whether to Build Modularly or In-Place
Process Development Symposium
2018
2018 Process Development Symposium - Applying New Technologies in Process Development
General Paper Pool/Available Papers
Modular Systems
Thursday, June 7, 2018 - 1:30pm to 2:00pm
The essential factors engineers and managers need to consider when deciding to build a plant modularly or in place can be broken into three main categories: appropriateness of the scale, inherent business and process characteristics, and the economic and safety risks associated with the process. Incorrectly analysing implications of the fundamental elements affecting a decision to build modularly or considering the wrong or lesser factors can lead to safety and environmental issues, poor returns on investment, and quality problems that hinder effective operation. Zeton explores the core design considerations in more depth and leverages its 30 years of experience in the design and fabrication of modular pilot, demonstration and small production plants to analyze how key factors weigh in on decisions to build modularly or in place.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $695.00 |
AIChE Graduate Student Members | $695.00 |
AIChE Undergraduate Student Members | $695.00 |
AIChE Explorer Members | $895.00 |
Non-Members | $895.00 |