A project team for an overseas grassroots LNG plant struggled for months attempting to develop a comprehensive series of control schemes for a vital plant utility unit. Having no success, the EPC and DCS Vendor eventually turned to an experienced Process Control Engineering Consultant for help. In a matter of a few days, a conceptual design was developed and approved, followed by detailed design and testing within a virtual environment. The design was then successfully implemented at site, along with numerous enhancements to address unexpected instrumentation and process design issues.

Upon completion of commissioning, the utility systems, as well as the balance of the plant, was run in fully automatic control – something that had not been experienced since the plant was originally commissioned.

Using this real-world situation as a backdrop, this presentation illustrates the practical application of the “8 Rules” and how it provided Operations with the handles and situational awareness they needed to reliably control the plant. It also illustrates how a creative solution avoided the main issue that stymied the project team: a documented DCS “feature”.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $19.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $29.00
Non-Members $29.00