Nowadays, many companies are forced to make new investments / innovations in various fields in order to make them stronger in many ways due to changing and developing conditions (process technologies, environmental requirements, competition, profits etc.).

In order to ensure continuity in the face of these dynamics, refineries should also consider the changes to be implemented in terms of safety, environment, health and reliability. If the planned changes are applied on site without appropriate hazard analysis the risk of a process safety accident could increase significantly

The desired changes should cover that employees and the environment society’s health&safety, facility’s equipment safety and reliability.

In refinery, MOC system cover the scope of change is in operating conditions, facilities, raw materials, flow rate, and others.

The changes to be evaluated by the appropriate team- should include various departments and its qualified engineers. During the risk assessment studies, team analyze the request and evaluate the risk if it is acceptable risk level or not. If it is not, the team can make suggestions to reduce risk or rejected the request.due to the safety issues. If the change request’s details are proper and covered all safety and technical issues, the request is approved by team members. Then, the change request will be sent as a package which include all risk assessments and technical drawings to the managers for reviewing and approving. If the, approval steps could be done then the change request will be started applying on site. At the end of the change, the revision of the relevant documents, employees and affected sites to be provided training about the changes.It’s very important that to share new situation’s risks and its barriers/procedures which are new for related sites. All those steps's risk assessment studies and updating of documents are applied and tracked by MOC system.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $19.00
Employees of CCPS Member Companies Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $29.00
Non-Members $29.00