CGC Fouling Control for Six Year Run Length Achievement in C2-C3 Feed Gas Cracker | AIChE

CGC Fouling Control for Six Year Run Length Achievement in C2-C3 Feed Gas Cracker

Type

Conference Presentation

Conference Type

AIChE Spring Meeting and Global Congress on Process Safety

Presentation Date

March 26, 2024

Duration

20 minutes

Skill Level

Intermediate

PDHs

0.50


This is a case history of collaboration between PETRONAS Chemical Olefins and Dorf Ketal that improved Cracked Gas Compressor system fouling control in a C2-C3 gas cracker feed to achieve a six-year run length. The collaboration identified root causes of historical fouling problems in this system. Improved understanding of root causes resulted in changes in wash oil & wash water injection, antifoulant chemistry, injection systems and monitoring. A combination of these actions and disciplined execution led to this success.

The paper will review the history of the fouling control program, past and present to demonstrate the correlation between program design and run length results.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $19.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $29.00
Non-Members $29.00