Typically, maximum ethylene plant profit equates to maximum production. Every plant has constraints that limit production. Some of them require significant investments to eliminate, while others do not. A Push Test is a simplified study procedure to identify low risk, low investment opportunities to stretch plant production capacity. While this concept can be applied to larger expansions, typically the objective of a Push Test is to find a set of potential incremental breakpoint modifications that can be easily implemented to boost plant capacity by five or ten percent, without a major investment.
The Push Test procedure combines the use of design capacity factors, operational reviews, and localized plant testing to âpushâ individual unit operations to their constraining limits to confirm their available remaining capacity with a high degree of confidence. Incremental breakpoints are identified, along with potential modifications needed to mitigate the associated constraints.
The paper will elaborate on the Push Test procedure for an ethylene plant, including descriptions of how to test individual unit operation capacity limits after reaching the initial plant constraint when increasing feed rate. Examples of potential Push Test applications will also be provided
Presenter(s)
Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits.
If you have already viewed this content,
please click here
to login.
Language
Pricing
Individuals
AIChE Member Credits | 0.5 |
AIChE Pro Members | $19.00 |
Fuels and Petrochemicals Division Members | Free |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $29.00 |
Non-Members | $29.00 |