Retrofitting Burner Management Systems At Existing Furnaces | AIChE

Retrofitting Burner Management Systems At Existing Furnaces

Type

Conference Presentation

Conference Type

AIChE Spring Meeting and Global Congress on Process Safety

Presentation Date

May 1, 2013

Duration

30 minutes

Skill Level

Intermediate

PDHs

0.50

Retrofitting Burner Management Systems at Existing Furnaces

This paper presents a pragmatic approach for how to retrofit and safely operate the firing system for an existing cracking furnace.

With respect to safety, the firing system needs to work inside a defined operating window. This has to be ensured at all times in order to avoid mis-operations such as uncontrolled combustion, under-stoichiometric combustion, unstable combustion, and over-firing. Operation outside the operating window could occur because of an operational human error, improper safety controls, or malfunctioning of the equipment. It appears that most furnace explosions occur during special operations like burner light-off and decoke operations.

This paper addresses how the firing system of an existing furnace can be retrofitted such that it complies with the intent of the EN 746-2 or equivalent standard.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $15.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $25.00
Non-Members $25.00