Steam Blow Line Split – Cause, Corrections, and Recommendations

Type

Conference Presentation

Conference Type

AIChE Spring Meeting and Global Congress on Process Safety

Presentation Date

April 21, 2021

Duration

25 minutes

Skill Level

Intermediate

PDHs

0.50

Standard industrial practice for cleaning steam circuits is the use of a low-pressure continuous steam blow, where a steam flow is controlled at conditions defined to create pipe wall forces above what is expected under normal operation. The steam control is commonly accomplished with the use of an orifice plate or a ‘sacrificial’ valve. During the 2017 commissioning of an ethylene production facility in Freeport, Texas a steam line failed and split open while performing a low-pressure continuous steam blow. This paper discusses the details of the failed steam blow, the cause of failure (line irregularities, acoustic induced vibration), and the leverageable corrections made to effectively and safely re-establish and complete the steam blow.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $19.00
Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $29.00
Non-Members $29.00