Page 31 - 310 Metrics Effectively Using Metrics to Improve PS
P. 31

Risk Based Process Safety (RBPS)         Preventative     Mitigative    Discipline    Source
                 Element                                                                Responsibility

                                                              Operate (BPCS)   Critical Alarms   Active Mitigation   Passive Mitigation   Emergency Res.



                 Cross-                                                                   Engineering   Operations   Maintenance
                 referenced   Process Safety Metrics     Design
                 elements                                              SIS
                 Operational Readiness
                              Percentage of start-ups   X   X                           X    X   X       C
                              following plant changes
                              where no safety problems
                              related to the changes
                              were encountered during
                              recommissioning or start-
                              up
                 Management   Changes implemented           X                           X    X           G
                 of Change    without management of
                              change or pre-startup
                              safety review

                 Conduct of Operations
                              Number of extended shifts     X                                X    X      C
                 Asset        Length of time plant is in   X    X    X                  X    X   X       C
                 Integrity    production with items of
                              safety critical plant or
                              equipment in a failed state,
                              as identified by inspection
                              or as a result of breakdown
                              Fatigue risk education        X                           X    X   X       C
                              Percentage overtime           X                           X    X   X       C
                 Asset        Activation of mechanical   X  X        X   X              X    X           C
                 Integrity    shutdown system
                 /Emergency
                 Management
                              Safe operating limit     X    X   X                       X    X           C
                              excursions
                 Asset        Activation of a safety   X    X        X                  X    X           C
                 Integrity    instrumented system
                 /Emergency
                 Management
                              Demands on safety        X    X        X                  X    X           C
                              systems
                 Asset        Activation of pressure   X    X            X              X    X   X       C
                 Integrity    relief device not counted
                              as a process safety incident
                              or loss of primary
                              containment
                 Asset        Demand on safety critical   X  X  X    X                  X    X            I
                 Integrity    elements



                                                             29
                                      Linking Metrics to Improve Process Safety Performance
                         AIChE 2023.  All rights reserved.  Reproduction for non-commercial, educational purposes is encouraged.